Targets, pathways and projectsv1.0

Decarbonization Manager

Set targets from the same base year you report, forecast your emissions, and manage the mitigation and adaptation projects that get you there.

Forecast scenariosIllustration
20252050
By 2030
−42%
Net zero
2050

Standards-aligned by design

Aligned with the standards your verifier will check

The Decarbonization Manager uses your verified inventory as the baseline, and supports the methods behind science-based targets.

How we apply each standard
SBTiScience-based target methods
GHG Protocol Mitigation Goal StandardTarget design and tracking
GHG Protocol Project StandardProject-based reductions
IPCC AR4, AR5, AR6Global warming potentials

Standard names are used for reference only. ClimateTab is not certified, accredited or endorsed by the organizations or exchanges that publish these standards. Third-party verification of your inventory or report remains with an independent verifier.

What’s included

Everything you need, in one place

Multi-target setting

Near-, medium- and long-term targets, absolute or intensity, by scope.

Customized forecasting

Forecasts that reflect your own business growth, assets and products.

Mitigation projects and milestones

Fuel switching, efficiency, renewables and more, with progress tracking.

Cost of abatement

Compare projects by net cost per tonne of CO₂e avoided.

Adaptation projects

Plan and track adaptation measures and their milestones.

Climate risk matrix

Map physical and transition risks by likelihood and impact.

Dual Scope 2 tracking

Follow progress on both location- and market-based Scope 2.

Data onboarding and API

Bring in project and forecast data in bulk or through APIs.

Waterfall and heatmap views

See which projects close the gap between today and your target.

Data in, your way

Forms, bulk upload, APIs, or just ask 3AI

Every team brings data differently. ClimateTab takes it however it comes, and 3AI can do the set-up for you.

Intuitive forms

Guided entry with units, evidence and validation built in.

Activity
Diesel · generators
Quantity · 4,820 L
Bulk upload

Drop in CSV or Excel files built from ready-made templates.

q4_electricity.csv0 rows
Validating units…
REST APIs

Stream data from ERP systems, meters and procurement platforms.

POST /v1/activities
{ "site": "Sohar", "kWh": 18,240 }
201 Created
3AI automation

Ask in plain language: 3AI builds templates, adds records and checks results.

Add March electricity for Dubai
Done: 42,600 kWh added.
Cost of abatement

Which projects pay for themselves?

Compare mitigation projects by cost per tonne of CO₂e avoided (height) and the tonnes they avoid (width). Click a project for details.

Cheapest firstWidth = tCO₂e avoided per year · Illustration
LED and controls
·
How it works

From set-up to report in three steps

01

Start from your baseline

Your base year comes straight from the inventory; 3AI can check you are on track at any time.

02

Set targets and pathways

Model scenarios with the growth, technology and policy assumptions you expect.

03

Deliver the projects

Assign owners, track milestones and see the effect on your trajectory.

Plan your path to net zero

We’ll show you how your inventory becomes a roadmap.

Messages

No messages yet

Your conversations with 3AI will appear here.

3AI AI Agent · ClimateTab
Hi! I'm 3AI, your ClimateTab assistant.

Ask me anything about ClimateTab's features, modules, pricing, or how to get started with carbon and ESG reporting.
3AI · AI Agent · Just now